The building is really starting to take shape with the partition walls having gone up and the roof nearly complete.
A Blog providing information on the refurbishment and redevelopment of Ledbury Halo Swimming Pool and Gym
Tuesday, 25 October 2016
Staff tour
Staff from Ledbury Halo swimming pool had a site tour of the new building today.
The building is really starting to take shape with the partition walls having gone up and the roof nearly complete.
The building is really starting to take shape with the partition walls having gone up and the roof nearly complete.
Tuesday, 18 October 2016
Builders to the rescue...
Our team came to the rescue yesterday after a gentleman reversed his car into a ditch at the side of the Ledbury Halo Swimming Pool car park. After a few beeps of the horn, our builders on site became aware of the accident and worked together to pull the car out of the ditch and make sure that the driver was unharmed.
Hats off to you gents!
Hats off to you gents!
Thursday, 1 September 2016
Works so far...
Since starting on site in early July 2016, Speller Metcalfe has demolished the front of the existing building, including the old reception, changing rooms and gym to make way for an extension with a new workout studio and spa facilities, extended gym, reception area and family friendly changing area.
The steel frame for the new extension has been erected and the site team have started installing the new drainage system.
The steel frame for the new extension has been erected and the site team have started installing the new drainage system.
Tuesday, 16 August 2016
The site team have been hard at work the last couple of
weeks erecting the scaffolding inside and outside the swimming pool area.
The reduced level of excavations along with all of the
foundations and underpinning have been completed on site. Concrete columns
surrounding the pool area have been prepared and bolts set for steel portals.
Due to complications with paint specifications we were
unable to erect the steel frame on schedule. However, the problem has been
resolved and the programme has not been affected by the delay.
Our guys have definitely been lucky with the weather this week as the steel frame arrives!
The pre-cast concrete floor beams to the first floor area
are programmed for installation on the 22nd August 2016 for two
days. For this reason, the Halo leisure swimming pool car park will be closed
between 22/08/16 – 24/08/16.
Monday, 25 July 2016
We have been busy the last couple of weeks completing
the demolition of the front of the building, including the old reception,
changing rooms and gym.
As part of the demolition work, we have had to remove some
asbestos.
Our ground workers have started laying the foundations for
the steel frame which will be arriving on site in early August.
Foundation without poured concrete
The roof of the existing swimming pool has been removed.
View of Ledbury from the roof
Birdseye view of the site
Halo Leisure has created a temporary gym on site for
existing members and are welcoming non-members to join at a reduced price.
Gym members still have access to the original car park. We have created a well-lit
footpath that runs from the car park to the temporary gym.
Any questions? Tweet us @spellermetcalfe
Tuesday, 5 July 2016
Welcome to the
Ledbury Halo blog
We are the main building contractor responsible for the the
redevelopment of Ledbury Halo swimming pool. Our site team have set this blog
up to share construction updates with the local community in Ledbury.
Not only do we want to use this blog as a means of
communicating with the local community but we want residents of Ledbury to use
this platform to share their thoughts on the new development. So feel free to
join in by sharing, commenting and posting your thoughts on the exciting new
development taking place in Ledbury.
Don't forget to tweet us!
And we’re off….
On the 6th July, Halo handed over the
keys for the Ledbury swimming pool. Since then, our construction team have set up
site, prepped the area for demolition, established temporary electrical supply
to the site cabins and completed demolition works.
We have been joined on site by Smiths Ltd, who we regularly
work with at Speller Metcalfe. Smith Ltd are in charge of demolishing the
existing building, including the reception, changing rooms and seating area in
the swimming pool to make way for a new modern façade.
MW Scaffolding have also joined us on site to set up the scaffolding
surrounding the swimming pool so that we can remove the existing roof.
Prepped and ready to go, this month we will be digging out the
foundations and drainage and removing the existing windows to the swimming pool.
Thank you to Simon Henshaw for filling in as site manager
whilst Ian was on holiday and hello to Speller Metcalfe employee, Ben Hodson,
who has joined us on site to carry out any carpentry work that is needed.
Tuesday, 15 March 2016
Ledbury Halo Refurbishment
Hello and Welcome to the Ledbury Halo Blog keeping you updated as to the progress of the redevelopment of Ledbury Halo - Swimming Pool and Gym.
Halo Leisure in partnership with Herefordshire Council and main contractors SpellerMetcalfe are spending an estimated £2.3 million on a refurbishment of Ledbury’s swimming pool, with work starting in June 2016 to be completed by April 2017 .
The social enterprise and registered charity has already spent some £7.5 million transforming their facilities in Bromyard, Hereford, Leominster and Ross but their CEO, Scott Rolfe, says the facilities at Ledbury swimming pool and the thousands of local people who use it have long been a priority for the leisure group.
£2.3m is being invested into an exciting development of Ledbury Swimming Pool:
- New fitness suite:
- twice the size of existing gym
- double the current number of pieces of equipment
- New fitness studio - supporting personal training and an enhanced group exercise class timetable
- New sauna, steam room and feature shower
- Fresh new family friendly changing facilities
- New reception area
The building work which includes an extension starts in June 2016 and will be completed by April 2017.
Temporary closure of facilities
“The scale of the refurbishment and the need to have the best quality build in the shortest time frame makes it financially and practically impossible for the centre to remain open during the project.” said Scott Rolfe, Halo Chief Executive. “The decision of a short term closure (June 2016-April 2017) has not been taken lightly and all alternatives have been fully explored. Although the swimming pool will close we are hoping to relocate the gym to the youth club next to the pool. It will be bigger and have even more equipment and we will also run our group exercise classes from there too.”
Halo will be communicating to all customers outlining the alternative options and offers available to them during the building project including relocating the gym to what used to be the youth club in Bye Street - more details to follow....